Skip to main content

Niquan Energy

Main navigation

  • About Us
  • Integrated Solution
  • Products
  • Team
    • NiQuan Energy, LLC
      • Board of Directors
      • Executive Team
    • NiQuan Energy Trinidad LTD
      • Board of Directors
      • Executive Team
      • Management Team
  • ESG
    • Environmental Commitment
    • Social Responsibilities
    • Governance
      • Our Corporate Governance Code
      • Our Board Composition
      • Our Board Meetings
      • Our Board Committees
      • Our Management
      • Our Delegations of Authority
      • Our Compliance Undertakings
      • Our Risk Management Framework
      • Our Procurement of Goods and Services
      • Our Anti-Corruption and Anti-Bribery Commitments
  • Careers
  • Media
  • Tour the Plant
  1. Home
  2. Our Blog
  3. NiQuan Marches Towards Start Up

NiQuan Marches Towards Start Up

Posted December 16, 2021
NiQuan Marches Towards Start Up

NiQuan Energy has been working assiduously with its contractors and is well advanced to complete all necessary safety processes items according to Hazard and Operability Analysis (HAZOP) and Layers of Protection Analysis (LOPA) standards, in preparation for the restart of the GTL Plant.

Once all safety measures have been implemented and accepted by NiQuan’s Engineer of Record, the plant will be brought back up to full commercial operation producing at a nameplate capacity of 2400bpd. The target date for that accomplishment is now set for 1st quarter 2022. 

NiQuan is also working with all the regulatory bodies––Ministry of Energy & Energy Industries (MoEEI), OSH, EMA, et al––as this is standard to becoming operational. The MoEEI regulatory process is not unique to NiQuan but is the norm for all plants in the industry. Consistent with this requirement is the appointment of a Certified Verification Agent (CVA) who is the MoEEI’s representative on the plant to ensure all plant and process works meets all applicable codes and standards as they are being implemented. 

This is essentially a verification authority for assurance on behalf of the MoEEI. The CVA has been working with NiQuan since 2019.

As NiQuan completes required works and begins to re-start the plant, the MoEEI will issue provisional approvals on a step-by-step basis––from the Company bringing gas onto site, to lighting the boiler, through the reformer, FT Reactors, all the way to storage of product in the NiQuan tanks with final approval only being provided after the plant is fully up and running. For example, when NiQuan needed approval for the reintroduction of natural gas to the boiler to carry out steam cleaning of various vessels and piping just after the incident, the Company provided documents and received the appropriate provisional approval.

NiQuan is committed not only to being a Clean Energy Company but also to the safety of its’ plant, people and community.

Back to All News

Latest Blog Entries

  • NiQuan's Statement on Appeal to Reverse the Decision of the High Court of Trinidad and Tobago. READ MORE >
  • NiQuan Makes GTL History In Trinidad. READ MORE >
  • NiQuan Marches Towards Start Up. READ MORE >
  • “A TRIUMPH, A RESOUNDING SUCCESS”. READ MORE >
  • NiQuan Donates Laptops For Online Learning. READ MORE >

Blog Categories

Niquan Energy Logo

NiQuan Energy LLC

1775 I St, NW Suite 1150
Washington, DC 20006
United States

 P  202-296-1616  |  F 202-318 7776

NiQuan Energy Trinidad Limited

Suites 13/14
Tropical Plaza
Southern Main Road
Pointe-A-Pierre
Trinidad and Tobago, West Indies
 

Info@niquanenergy.com

Media@niquanenergy.com 

Get in Touch

  • Terms and Conditions
  • Career Opportunities
  • Employee Login

© 2023 NiQuan Energy, LLC. All Rights Reserved.